For Chlorination of new water mains and fittings, pipe work, showers, toilets, kitchens/Canteens and all other welfare facilities, Cedek flush the pipe work and inject chlorinated solution into the system to perform a disinfection contacting all inner surfaces. Once the required contact time has been achieved the water is drained from the system and neutralised in line with Environmental requirements before being disposed of safely. The system is then flushed again with fresh mains water and sampled so that Microbiological Analysis can be performed by a UKAS Accredited Laboratory.
On receipt of the results from a UKAS Accredited Laboratory, Cedek provide the client with a report and Certificate of Analysis for each sample taken. This certifies the cleanliness of the pipework/tanks and provides customers with Quality Assurance records for any Environmental Health Officer visit/ inspection.
What we routinely test for:
- Temperature
- Water Hardness
- Conductivity
- PH TDS Iron Nitrate Molybdate Glycol
- E-Coli
- Total Coliforms
- Microbiological Samples – TVC counts
- Chlorine residuals
- Clarity